Hochsitz Korea

This year the XXIII Olympic Winter Games took place in PyeongChang (South Korea). This time, in collaboration with Loidl GmbH, we were pleased to contribute to the planning for an entire "Nations´ Village“.

The building components were first used in Bermuda for the America´s Cup, dismantled and then, in containers of 60 pieces, shipped to Korea. The wooden, steel and glass constructs were rebuilt at – 23 ° C (minus 23 degrees Celsius) and then stood ready and waiting, in anticipation of the games. The "Nations´ Village“ then hosted the House of Switzerland 1+2, Team USA and P&G Home, Team Italy, Mediacenter and Team Sweden.

Our areas of responsibility: general planning

Renderings: Harri Seidl

HOCHSITZ 
www.hochsitz.at/pyeongchang

VIMEO  www.vimeo.com/235083422
HOUSE OF SWITZERLAND  www.houseofswitzerland.org/de

Holzbau Austria / temporary eventconstrucion: www.holzbau.at

Hochsitz Cup Bermuda

The Hospitality House and the Media Center were built for the America´s Cup in Bermuda 2017.
The temporary buildings are made out of steel, glass and cross-laminated timber.

Clients: Bernd Loidl, Hochsitz GmbH

Our areas of responsibility: planning, structural engineering

AMERICA`S CUP www.americascup.com
HOCHSITZ  www.hochsitz.at
VIMEO  www.vimeo.com

 

 

Hochsitz for the Olympics in Rio

In regards to the Olympics 2016 at Rio de Janeiro, 2 raised hides, the Arpoador Rock Media Center and the House of Switzerland, were built. The temporary buildings are made out of steel, glass and cross-laminated timber.

Client: Bernd Loidl, Hochsitz GmbH

Our areas of responsibility: planning, structural engineering

Arpoador Rock Media Center - ORF and SRF (swiss and austrian television) TV-studios

ORF: www.der.orf.at
Basellandschaftliche Zeitung: www.basellandschaftlichezeitung.ch
Südostschweiz: www.suedostschweiz.ch

VIMEO:
Best of Switzerland Rio
The Ipanema View Media Centre
Timelapse of the set up of Ipanema View Media Centre

 

 

House of Switzerland

Official Website: www.houseofswitzerland.org

20 Minuten - Bildersammlung: www.20min.ch

Visit Rio: www.visit.rio

Blick: www.blick.ch

 

Hochsitz Sochi

Hochsitz Sochi

2013-2014

Temporary Event Location, wood-steel-glass construction

 

Idea and Design: Bernd Loidl, Hochsitz GmbH

Our areas of responsibility: building physics, implementation planning, structural engineering

VIMEO Clip

www.hochsitz.at

Hochsitz Glasgow

Hochsitz Glasgow

2013-2014

temporary TV-studio, wood-steel-glas construction

 

idea, design: Bernd Loidl, Kitzbühel

Our areas of responsibility: building physics, implementation planning, structural engineering

 

Red Bull Airrace

Red Bull Airrace

Mobile Constructions

Our areas of responsibility: structural engineering

Airrace Istanbul:

Airrace Abu Dhabi:

Formula 1 Red Bull

Formel 1, Red Bull

Mobile event tent constructions

 

Our areas of responsibility: structural engineering

On the pictues you see the built glass railings at Monaco.

CC Baku

Convention Centre, Baku

New construction of a conference center, designed for about 4500 people in Azerbaijan

Our areas of responsibility: structural engineering

There are no articles in this category. If subcategories display on this page, they may have articles.

Cookies help us improve our website. By using this website you agree to the use of cookies. For more information, please take a look at our privacy policy. OK