Coffin factory Atzgersdorf

 

2019

On the basis of the repurposing of the existing listed rooms of the coffin factory, care has been taken to ensure that no crucial reinforcements would have an effect on the existing buildings and thereby influence the listed structure. For example, for the eastern part of the building, a steel skeleton has been set up in order to divert any additional loads.

 

An equivalent concept has been developed for the northern part of the building. Here, the structural measures focussed on a possible additional storey and upgrading of the existing structure in the front area of the building and a construction method was chosen that would likewise only penetrate the listed building slightly. All planned construction measures can be carried independently of the existing building.

 

For example, the reinforced concrete skeleton structure will be erected outside the existing building. Individual supports will only be placed in a single grid adapted to the existing building, between the existing supports, and passed through the roof of the existing hall. A load-bearing platform will be set up above the roof of the existing hall, from which a skeleton structure will be erected.

 

The cantilever of the new structure above the roof of the existing building will be supported by a diagonal brace, which will extend into the 6th floor, and secured by a suspension support at the front edge of the 6th to the 3rd floors. A temporary support for the construction in progress must be erected below each of the suspension supports and maintained until the shell is completed.

 

The temporary support will then be removed and the truss frame activated. The vertical load-bearing components will be based on jet grouting columns in the existing building and bored piles outside of the existing building in a way that is compatible with the settlement. The bracing will be achieved in part through reinforced concrete disks in the outer cores and disks or through crossovers made of high-strength steel components, which can fail in the event of fire thanks to the hot-state design of the entire structure and thus do not require fire protection.

 

Our areas of responsibility: fire prevention planning, structual engineering

Renderings: Janusch

 

Dreyhausenstraße

Dreyhausenstraße (Arquitectos)

2019

New Construction of a day-elementary-school in the 14th district of Vienna.

 

Our areas of responsibilit: building physics, building technology, fire prevention planning, structural engineering

Architecture, Renderings: ZT Arquitectos Lda

Dreyhausenstraße

Dreyhausenstraße (everySize)

2019

New Construction of a day-elementary-school in the 14th district of Vienna.

 

Our areas of responsibility: building physics, building technology, fire prevention planning, structural engineering

Architectur, Renderings: everySIZE-Arquitectura Lda

Dreyhausenstraße

Dreyhausenstraße (Proksa & Rödel)

2019

New Construction of a day-elementary-school in the 14th district of Vienna.

 

Our areas of responsibility: building physics, building technology, fire prevention planning, structural engineering

Achitecture, Renderings: Jan Proksa & Renate Rödel

Education campus Gasometerumfeld

2018

Construction of a new education campus in the 11th district of Vienna.

 

Our areas of responsibility: building physics, fire prevention planning, structural engineering

Client: Zinterl Architekten ZT GmbH

Achitecture, Renderings: Zinterl Architekten ZT GmbH

 

 

 

Alter Exerzierplatz

Alter Exerzierplatz

2017, 2nd Place

On the area of the former drill site in Korneuburg, about 360 modern and future-oriented residetial units will be built on 18.000 sqm of living space.

 

Our areas of responsibility: building physics, fire prevention planning, structural engineering

Client: Mikado Architects

Achitecture, Renderings: virtual dynamics, Mikado Architects

Education campus Atzgersdorf

Education campus Atzgersdorf

2017, 4th Place

The education campus Atzgersdorf is a project of the „Bildungseinrichtungen Neuprogrammes 2012-2023“, which involves the construction of 10 new buildings. Among School and education premises property there will be a therapy area, creative spaces, 2 divisible standard gym halls and a gymnastics hall.

 

Our areas of responsibility: building physics, fire prevention planning, structural engineering

Client: Zinterl Architekten ZT GmbH

Achitecture, Renderings: Zinterl Architekten ZT GmbH


 

Leopoldau xyz Vienna

Leopoldau xyz Vienna

Competitive win

Residential complex for young living with flexible possibilites for usage

 

Our areas of responsibility: building book, building technology, construction coordination, testing engineer, structural engineering

Architecture, Renderings: feld72 architekten zt GmbH

 

School-Location Längenfeldgasse

2016, Recognition Award

In an extension building, 17 educational rooms with adjoining rooms, as well as 2 professional school units with an additional 21 educational rooms including a kitchen area, sports area and administration area will be accommodated for a one-day school.

The building consists of an underground level and four above-ground floors. The shell construction is to be carried out in in-situ concrete, due to the complex static system results which occur during the interlacing of different stress areas.

 

Our areas of responsibility: building physics, building technology, fire prevention planning, structual engineering

Achitecture, Renderings: Zinterl ZT GmbH with ZT-Arquitectos Lda.



Education campus Aron Menczer

 

2016

New construction, education campus for 1.350 children

kindergarden, elementary school and music school

 

Our areas of responsibility: building physics, building technology, fire prevention planning, structual engineering

Architecture, Renderings: ZT Arquitectos Lda.

 

KiGa Ebergassing

KiGa Ebergassing

2016

Kindergarden, solid timber construction with cross laminated timber elements, monolithic stone slab as a base

 

Our areas of responsibility: building physics, fire prevention planning, structual engineering

Architecture, Renderings: Zinterl Architekten ZT GmbH, ZT-Arquitectos Lda.

Education Campus Nordbahnhof

BC Nordbahnhof, 1020 Wien

2016, 2nd Place

New construction, education campus for children between the ages of 0 and 15

The complex consists of three compact main buildings, which contain a kindergarten, elementary school, new secondary school, secondary vocational school and a music school.

The aspect of fire protection will receive special attention and every section of the compound will be equipped with numerous escape routes.

 

Our areas of responsibility: building physics, building technology, fire prevention planning, structual engineering

Architects, Renderings: everySize arquitectura limitada

Kepler University Linz

Kepler University Linz

2015

new construction of a campus building for the medical faculty

A four-story solid construction will be built upon an existing underground garage.
Spacious atriums will give the building an airy feel to soften up its look. A 12 meter overhang of the top two floors has also been proposed.

 

Our area of responsibility: structural engineering

Planning: Arge Sue Architekten ZT GmbH and HOPPE architekten ZT-GmbH

The images were provided by Sue Architekten ZT GmbH.

 

Schwedenplatz Vienna

Schwedenplatz, 1010 Wien

2015

Redesign of the whole square including the traffic area

 

Our area of responsibility: Consulting

Architecture, Planning, Photos: Architect Franz Denk

Landscape Design: Office Schön

Vienna Museum New

Wien Museum

2015

New construction with a connection to the existing museum at Karlsplatz

All of the exhibition areas are located in the new museum, which is designed as a solid construction in outer walls made of insulating concreed. Lightweight concreed ceilings allow the spanning of wide room depths. The interior spaces held in white emphasise the sculptural structure.

The listed stock remains almost unchanged and is subterraneously linked to the new construction.

 

Our area of responsibility: structural engineering

Planning, Photos: Architect Juri Troy

Film House WDR Cologne

Film House WDR Cologne

2015, 2nd place

General renovation, the main focus is the greatest possible flexibility for the use of space regarding structural and work changes as well as developments

 

Our area of responsibility includes: structural engineering

General planner: HOLODECK architects ZT GmbH

Renderings: HOLODECK architects ZT GmbH, isochrom

Gallery Krems

Gallery Lower Austria, 3500 Krems

2014

New Gallery of the Lower Austrian museum landscape with connecting bridges for pedestrian traffic

 

Our area of responsibility: structural engineering

Planning, Photo: Architect Juri Troy

 

Main Fire Station Vienna

Main Fire-Station, 1020 Vienna

2014, 4th Place

The majority is a new and modern adaptation of the remaining areas

Main Fire-Station consisting of multiple-stories: main building, training tower and vehicle depot

 

Our areas of responsibility: building physics, structual engineering

Planning, Renderings: Architektur-Consult ZT GmbH

 

 

 

WUB Innsbruck

WUB climbing center, 6020 Innsbruck

2014

Inventory annex in a massive construction

New climbing hall as an engineered wood construction

 

Our area of resposibility structural engineering

Planning, Renderings: HOLODECK architects ZT GmbH

 

BH Kirchdorf

District Commision Building, 4560 Kirchdorf

2014

New Office and Administrative Buildings

 

Our area of responsibility: structural engineering

Planning, Modell: DI Jürgen Zankovitsch

University of Music Vienna

University of Music and Performing Arts, 1030 Vienna

2014

Renovation and expansion of the former Anatomy-building, adaptation as a library

New Future Lab, integration into the existing campus

multifunctional halls with special acoustic requirements

 

Our areas of responsibility: building physics, structural engineering

Planning: Architektur-Consult ZT GmbH, pm1 projektmanagement, KWI Engineers GmbH, SUE Architekten ZT GmbH

The Renderings of the library were provided by SUE Architekten ZT GmbH.

KH Dornbirn

Annex Hospital, 6850 Dornbirn

2014

Extension and conversion of the operation area during business time

 

Our area of responsibility: structural engineering

Planning, Renderings: SUE Architekten ZT GmbH

GTNMS Stammersdorf

GTNMS Stammersdorf, 1210 Vienna

2014

New full-time secondary school for about 500 students. Thematically-grouped pavilions at a college campus.

 

Our area of responsibility: structural engineering

Planning, Renderings: Architektur-Consult ZT GmbH

U5 Vienna

Train-Line Design U5

2014

Modular system concept for the new Viennese subway line 5 with cane ceilings, functional blocks and a diagonal floor grid

 

Our areas of responsibility: building physics, structural engineering

Planning, Renderings: Soma ZT GmbH

Business Center Vienna

Business Center at the Central Station, 1100 Vienna 

2013, Invited Competition

Office and administration buildings, greatly variable roofscape 

 

building type: Stahltruktur with significant projections

Our area of responsibility: structural engineering

Planning, Photos: Architektur-Consult ZT GmbH

Post Headquaters Vienna

Post headquarters, 1030 Vienna

2013, 2nd place

Representative office and administrative property with integrated retail space

 

Our areas of responsibility include: building physis, construction coordination, testing engineer, risk analysis, structural engineering

Architecture, Renderings: HOLODECK architects ZT GmbH

BC Gnigl Salzburg

Campus Gnigl, Salzburg 5020 

2013, 2nd place

Construction of kindergarten, a pre-and elementary school and new lounges for connecting the ground floor building complex with a cantilever roof

 

Our area of responsibility: structural engineering

Planning, Renderings: SUE Architekten ZT GmbH

 

DM HQ Karlsruhe

DM Headquarters, 76131 Karlsruhe

2013

New corporate headquarters, grid-like Zero-Energy Buildings constructed on different foundation conditions

 

Our area of responsibility includes: structural engineering

Planning: COOP HIMMELB(L)AU Wolf D. Prix & Partner ZT GmbH, Architektur-Consult ZT GmbH

The renderings were provided byCOOP HIMMELB(L)AU Wolf D. Prix & Partner ZT GmbH.

Expo 2015 Milan

Expo 2015, Milan

2013, 4th Place

Austria Pavilion / A table in the countryside

Mobile solid wood construction made up of recyclable items as a table with a reinforced fabric as a tablecloth

Architectural approach

 

Our area of responsibility: structural engineering

Planning, Developing, Renderings: WERKHOF ARCHITEKTEN ZT GmbH

Rathausstraße Vienna

Rathausstraße, 1010 Vienna

2013

New representative office building

Building of two core zones around the staircase, the southern core is continuous from the ground floor to the upper floors, the northern core rests on the ground on diagonally arranged pillars, which are integrated into the shaft structure.

 

Our area of responsibility: structural engineering

Planning, Renderings: Smartvoll Architekten ZT KG

Bypass Linz

"Bypass" for Voest-Bridge, 4020 Linz

2013

2 additional highway bridges with pedestrian and bicycle connections across the danube

 

Our and backbone zt GmbH's areas of responsiblity: structural engineering

Competition Community: HOLODECK Architects ZT GmbH, backbone zt GmbH, KPPK Ziviltechniker GmbH

Design, Renderings: HOLODECK Architects ZT GmbH

Parliament Vienna

Restoration Parliament, 1010 Vienna

2013

Complete reconstruction of the National Council Chamber, modernization of the structure and

opening to the outside, the logic of the historic substance remains

 

Our areas of responsibility: building physics, structural engineering

Design, Renderings: SUE Architects ZT GmbH

Danube Flats Vienna

Danube Flats, 1220 Vienna 

2012

Vertical and horizontal structure as an urban space closure. The building serves various functions and provide many variability options. 

Skyscraper: Frameworks, double-glass facade

Landscraper: multi-story in a mixed and lightweight concrete and solid wood constructions

 

Our areas of responsibility: structural engineering

Planning, Renderings: SUE Architects ZT GmbH

Building Yard Eisenstadt

Building Yard Eisenstadt

2011

Building Yard, 7000 Eisenstadt 

 

Our areas of responsibility: structural engineering

Planning: Engineering Office Bandlhofer

Office Building Ernstbrunn

Office Building, 2115 Ernstbrunn 

2011

"Surplus-energy office building wind-power Simonsfeld"

 

Our areas of responsibility: structural engineering

Planning: Abendroth Architects

Askö Sport Center Graz

Triple-Discipline Sports Hall, 8020 Graz 

2011

Construction of a new sports hall for the International Association of Sport and Physical Education in Austria, short Askö

 

Our areas of responsibility: structural engineering

Planning, Renderings: Smartvoll Architects ZT KG

Secondary School M.Enzersdorf

Liese Prokop School, 2344 Maria Enzersdorf 

2011

Construction of a new upper secondary school and trade school for elite athletes

 

Our areas of responsibility: structural engineering

Client: Verien Austrian competitive sports center Südstadt 

Planning, Renderings: x-architects

 

 

 

Kindergarden South Tyrol

Kindergarden, South Tyrol 

2011

Construction of a kindergarten with a green roof

 

Our areas of responsibility: structural engineering

Planning, Photos: HOLODECK architects ZT GmbH

 

O. Wagner Hospital Vienna

Otto Wagner Hospital, 1140 Wien 

2011

Restoration and adaptation of the listed pavilion 17

 

Our areas of responsibility: structural engineering

Planning, Renderings: ArchitekturConsult, Vienna 


Academic Secondary School Salzburg

Academic Secondary-School, 5020 Salzburg 

2011

Renovation and expansion of the existing building, floor increase as a solid wood construction and frame with a precast.

 

Our areas of responsibility: structural engineering

Planning, Renderings: feld72 architekten zt GmbH

Rescue Station Kaiserebersdorf

Rescue Station Kaiser Erbersdorf, 1110 Wien 

2010

New, combination of solid-structures and frameworks

 

Our areas of responsibility: structural engineering

Planning: HOLODECK architects ZT GmbH

 

Financial Center Wr. Neustadt

Financial Center, 2700 Vienna Neustadt 

2010

Redesign of the European hall, the foyer, the catering zone and partial redesign of the the adjacent outdoor areas.

 

Our areas of responsibility: structural engineering

Planning, Rendering 1st floor: Silberpfeil Architects ZT GmbH

 

HTL Mödling

HTL, 2340 Mödling 

2010

New construction and renovation of the kitchen and dining area

 

Our areas of responsibility: structural engineering

Planning: BME Bau Management ZT GmbH

developers: BIG Bundesimmobiliengesellschaft m.b.H.

Commerce Building Styria

Commerce Building Styria, 8021 Graz 

2010

Redesign of the European hall, the foyer, the catering zone and partial redesign of the adjacent outdoor areas.

 

Our areas of responsibility: structural engineering

Planning, Renderings: Smartvoll Architekten ZT KG

 

House of Bread Asten

House of Bread, 4481 Asten 

2010

Museum and adventure world

Multi-story building made out of composite steel and lightweight materials on a solid base; open space for a combination of exhibitions, production and catering

 

Our areas of responsibility: structural engineering

Planning: Koll Architects

The renderings were provided by Schreiner Kastler Office for communication GmbH.

Article -> "Paneum, (House of Bread II), Asten"

North Station Vienna

North Station, 1020 Wien 

2009

 

 

 

 

 

Secondary School Bregenz

BG Gallusstraße, 6900 Bregenz 

2009

Secondary School

 

Our areas of responsibility: structural engineering

Planning, Renderings: Flatz Architects

Kindergarden Vienna

Kindergarden Schukovitzgasse, 1220 Wien 

2009

kindergarden in a passive-house construction

In cooperation with Grundstein, NOVARC Architekten and Smartvoll Architects ZT KG

The picture was provided by NOVARC Architekten.

 

Marina Tower Vienna

Marina Tower, 1020 Vienna 

2009

Approximately 130m high office tower with an overhang on the two upper floors

 

Our areas of responsibility: feasibility study, seismic analysis, optimization

Design: Hoffmann-Janz Architects Ziviltechniker GmbH

Margaretensteg Vienna

Margaretensteg, 1050 Wien 

2009

Footbridge over the Margaretengürtel

 

Our areas of responsibility: structural engineering

Architecture: grundstein ZT KG

TU Innsbruck

Technical University, 6020 Innsbruck 

2009

Renovation of the facade, focusing on energy efficiency and a reversible floor plan

 

Our areas of responsibility: structural engineering

Planning: NOVARC Architects

Kneissl Spa Hotel

Kneissl Spa Hotel 

2009

Prototype for Kneissl Star Resorts

 

Our areas of responsibility: structural engineering

Planning: LAB Architekten ZT GmbH, SW ZT Chartered Consultants GmbH

Skywalk Parliament Vienna

Skywalk Parliament, 1010 Wien 

2008

Our areas of responsibility: structural engineering

Planning, Renderings: PURPUR.Architecture ZT GmbH

 

Connecting Bridge Vienna

Connecting bridge at Rennweg, 1030 Wien 

2008

Bridge between two buildings

 

Our areas of responsibility: structural engineering

Planning, Rendering: HOLODECK architects ZT GmbH

 

Stelzhamer School Linz

Stelzhamer School, 4020 Linz 

2008

Additions and remodeling of a middle school

 

Our areas of responsibility: structural engineering

Planning, Renderings: grundstein ZT KG

Shipping Center Krems

Shipping center, 3500 Krems 

2008

Circular spiral developed construction consisting of three floors

 

Our areas of responsibility: structural engineering

Planning, Renderings: feld72 architects zt GmbH

Erzherzog Karl Straße Vienna

Erzherzog Karl Street, 1220 Vienna 

2007

Housing, development of the urban expansion area

 

Our areas of responsibility: structural engineering

Planning, Renderings: Stadtgut Architects ZT KG

Residential and Commercial Park Vienna

Residential and commercial park, Vienna 

2007

New buildings and Increase in inventories

 

Our area of responsibility includes: structural engineering

Planning, Renderings: HOLODECK architects ZT GmbH

Hospital Mexico

Hospital in Mexico in 2007

2007

Our areas of responsibility: structural engineering

Architecture, Renderings: Stadtgut Architects ZT KG

Danube Bridge Linz

Danube bridge, 4020 Linz 

2005

Slanted rope bridge as an efficient structural system which elegantly spans large distances with low structural height independent from contact appearance.

Documentation Centre Berlin

Documentation Centre, Berlin 

2005

"Topography of Terror" documentation center on Nazi forced labor

 

Our areas of responsibility: structural engineering

Planning: Abendroth Architects

Renderings: EGKK Landscape Architects 

Condominium Vienna

Condominium, 1210 Wien

2004

Multi-story wood-mixed construction in a low-energy construction

 

Our areas of responsibility: structural engineering

Planning: Querkraft Architects ZT GmbH

School Center Monte Laa Vienna

School Center Monte Laa, 1100 Vienna

2004

General planner competition: elementary school, secondary school, day nursery, triple gymnasium and open spaces

 

Our areas of responsibility: structural engineering

Planning, Visualization: HOLODECK architects ZT GmbH

Exhibition Building Athens

Exhibition Building, Athens 

2002

Temporary exhibition building in connection with a pedestrian passage over a six-lane traffic route

 

Our areas of responsibility: structural engineering

Planning: HOLODECK architects ZT GmbH

Multi-Floor Family House

Multi-Floor Family House 2000

2000

Construction Price for multi-story buildings in timber construction 

Planning: Rainer Hochmayer, Klaus Petraschka

 

There are no articles in this category. If subcategories display on this page, they may have articles.

Cookies help us improve our website. By using this website you agree to the use of cookies. For more information, please take a look at our privacy policy. OK